Check readiness and credits
Confirm your simulation credits, the readiness tier of the catchment and the latest baseline before you spend compute.

- 1Open Overview from the left sidebar.
- 2Read the Simulation credits card: balance, the cost of a baseline and of a mitigation run, and the time the balance was confirmed.
- 3Check the Latest baseline cards (peak depth, buildings and roads above 15 cm, VMM benchmark) and the Data readiness panel.
- 4Choose Open digital twin to move into the map workspace.




